Home » Guest » GeoMin Team (Free Lance Consultants)

GeoMin Team (Free Lance Consultants)

Business category 1 Mining and Metallurgy Projects
City ( of main office ) Jakarta, ID, Indonesia
Address Jl Harapan Indah Kavling Tanah Afit No. 79. Medan Satria.
Phones 62-21-96512971
Fax 62-21-65702920
About HISTORY

We are professional geologists who trying to develop a business in geology and Mining Management consultants. With our abilities and expertise which we had, we want to offer services in the field of Coal Exploration and Mining Management. Our team are consist of 3 professional geologists who have experiences in the coal exploration. We mention our team as GeoMin Team that mean a team that have some expertises in Geology and Mining. This Team is formed in Jakarta with membership are: Mr Frans, Mr William and Mr Gerhard.

OUR SERVICES

In order to development of our cooperation network with other company, we want to offering services of exploration and mine operation management, with Our various services and technical competences as follows:

1. Geology and Out Crops Mapping

- Geological Report including our recommendation to go ahead or wind-up from the project.

- Preparation of Exploration Plan (depending on the out come the report) .

2. Exploration Drilling

- Propose some bore holes which have to be drilled.

- Drilling method: Full Core, Touch Core and Open Hole.

- Depth of Boreholes 60 m to 100 m. (depend upon client) .

- Sample analysis.

- Drill hole logs.

- Sample preservation in core boxes.

3. Geophysical Logging

- Density, Gamma Ray, Caliper and Resistivity

4. Topography Survey

Survey Data will be generated by using Total Station / GPS Survey Equipments.

- Contour map at 1 m interval.

- Establishment of Bench Marks.

- Incorporation of streams or any other physical topographic features that exists within the

area.

5. Geological Modeling

- Geological Model,

- Geological sections (longitudinal and cross sections) ,

- Maps of crop lines,

- Mineralized and non-mineralized area,

- Resource and Reserve Estimation as per JORC.

- Structural Geology Map (if any, depends upon the area and needs very closed spaced

drilling if the concession falls within the faulted zone) .

- Geology and Resources Estimation Report.

Note: To create a geological model and reserve estimation, Topography Survey data is a

must.

6. Mine Planning

- Pit Design,

- Quality wise quantity estimation,

- Blending Plan (if necessitates) ,

- Waste Dump Design,

- Inpit Haulage Design,

- Top soil Stockpile Design,

- Short Term Plan (for the first year only) ,

- Long Term Plan (Annual Pit, Dump Designs and / or, Backfilling Area) , Dewatering and

Drainage system Plan.

We will appreciate for an opportunity and trust that given to our team to cooperate with your company.

Date 2011 Oct 29, 00:10